Price decision wind power plants issued by the Energy Regulatory Office in 2005-2020

The price decision made by the Energy Regulatory Office no 3/2019 of September 26th, 2019, laying down support for supported energy sources.

 

(1.9.) Redemption prices and green bonuses for wind power plants:

Supported kind of energy Date of putting into operation production Single-band operation
from (and including) to (inclusive) Purchase prices [Kč/MWh] Green bonuses [Kč/MWh]
Větrná elektrárna - 31.12.2003 4 254 3 372
1.1.2004 31.12.2004 3 843 2 961
1.1.2005 31.12.2005 3 657 2 775
1.1.2006 31.12.2006 3 338 2 456
1.1.2007 31.12.2007 3 280 2 398
1.1.2008 31.12.2008 3 200 2 318
1.1.2009 31.12.2009 2 918 2 036
1.1.2010 31.12.2010 2 730 1 848
1.1.2011 31.12.2011 2 670 1 788
1.1.2012 31.12.2012 2 612 1 730
1.1.2013 31.12.2013 2 435 1 553
1.1.2014 31.12.2014 2 268 1 386
1.1.2015 31.12.2015 2 186 1 304
1.1.2016 31.12.2016 2 089 1 207
1.1.2017 31.12.2017 2 048 1 166
1.1.2018 31.12.2018 2 008 1 126
1.1.2019 31.12.2019 1 969 1 087
1.1.2020 31.12.2020 1 930 1 048

(1.9.1.) At the wind power plants put into operation after January 1th, 2005 inclusive the redemption prices and green bonuses according to the item (1.9.) should be applied for newly established power plants only, the technological units of which , especially the rotor and generator are in operation no longer then two years.

 

Price decision of the Energy Regulatory Office for download here.

 

Supported kind of energy Date of putting into operation production Single-band operation
from (and including) to (inclusive) Purchase prices [Kč/MWh] Green bonuses [Kč/MWh]
Větrná elektrárna - 31.12.2003 4 009 3 509
1.1.2004 31.12.2004 3 622 3 122
1.1.2005 31.12.2005 3 446 2 946
1.1.2006 31.12.2006 3 146 2 646
1.1.2007 31.12.2007 3 091 2 591
1.1.2008 31.12.2008 3 015 2 515
1.1.2009 31.12.2009 2 750 2 250
1.1.2010 31.12.2010 2 573 2 073
1.1.2011 31.12.2011 2 517 2 017
1.1.2012 31.12.2012 2 462 1 962
1.1.2013 31.12.2013 2 294 1 794
1.1.2014 31.12.2014 2 137 1 637
1.1.2015 31.12.2015 2 060 1 560
1.1.2016 31.12.2016 1 969 1 469
1.1.2017 31.12.2017 1 930 1 430

 

Price decision of the Energy Regulatory Office for download here.

 

(1.9.) Redemption prices and green bonuses for wind power plants:

Put into operation on Redemption price of the mains supplied power in CZK/MWh Green Bonus in CZK/MWh

Wind power plant put into operation from January 1th, 2014 till December 31th, 2015

1980 1450

Wind power plant put into operation from January 1th, 2014 till December 31th, 2014

2014 1534

Wind power plant put into operation from January 1th, 2013 till December 31th, 2013

2162 1682

Wind power plant put into operation from January 1th, 2012 till December 31th, 2012

2321 1841

Wind power plant put into operation from January 1th, 2011 till December 31th, 2011

2373 1893

Wind power plant put into operation from January 1th, 2010 till December 31th, 2010

2425 1945

Wind power plant put into operation from January 1th, 2009 till December 31th, 2009

2591 2111

Wind power plant put into operation from January 1th, 2008 till December 31th, 2008

2841 2361

Wind power plant put into operation from January 1th, 2007 till December 31th, 2007

2913 2433

Wind power plant put into operation from January 1th, 2006 till December 31th, 2006

2965 2485

Wind power plant put into operation from January 1th, 2005 till December 31th, 2005

3247 2767

Wind power plant put into operation from January 1th, 2004 till December 31th, 2004

3413 2933
Wind power plant put into operation prior to January 1th, 2004 3777 3297

(1.9.1.) At the wind power plants put into operation after January 1th, 2005 inclusive the redemption prices and green bonuses according to the item (1.9.) should be applied for newly established power plants only, the technological units of which , especially the rotor and generator are in operation no longer then two years.

 

The price decision made by the Energy Regulatory Office no 7/2011 of November 23rd, 2011, which sets the supporting for the production of renewable sources energy, combined production of electric power and heat and secondary energy resources

(1.7.) Redemption prices and green bonuses for wind power plants:

Put into operation on Redemption price of the mains supplied power in CZK/MWh Green Bonus in CZK/MWh
Wind power plant put into operation from January 1th, 2012 till December 31th, 2012 2230 1790
Wind power plant put into operation from January 1th, 2011 till December 31th, 2011 2280 1840
Wind power plant put into operation from January 1th, 2010 till December 31th, 2010 2330 1890
Wind power plant put into operation from January 1th, 2009 till December 31th, 2009 2490 2050
Wind power plant put into operation from January 1th, 2008 till December 31th, 2008 2730 2290
Wind power plant put into operation from January 1th, 2007 till December 31th, 2007 2800 2360
Wind power plant put into operation from January 1th, 2006 till December 31th, 2006 2850 2410
Wind power plant put into operation from January 1th, 2005 till December 31th, 2005 3210 2680
Wind power plant put into operation from January 1th, 2004 till December 31th, 2004 3280 2840
Wind power plant put into operation prior to January 1th, 2004 3630 3190

(1.7.1.) At the wind power plants put into operation after January 1th, 2005 inclusive the redemption prices and green bonuses according to the item (1.7.) should be applied for newly established power plants only, the technological units of which , especially the rotor and generator are in operation no longer then two years.

 

The price decision made by the Energy Regulatory Office no 2/2010 of November 8th, 2010, which sets the supporting for the production of renewable sources energy, combined production of electric power and heat and secondary energy resources

(1.7.) Redemption prices and green bonuses for wind power plants:

Put into operation on Redemption price of the mains supplied power in CZK/MWh Green Bonus in CZK/MWh
Wind power plant put into operation from January 1th, 2011 till December 31th, 2011 2230 1830
Wind power plant put into operation from January 1th, 2010 till December 31th, 2010 2280 1880
Wind power plant put into operation from January 1th, 2009 till December 31th, 2009 2440 2040
Wind power plant put into operation from January 1th, 2008 till December 31th, 2008 2670 2270
Wind power plant put into operation from January 1th, 2007 till December 31th, 2007 2740 2340
Wind power plant put into operation from January 1th, 2006 till December 31th, 2006 2790 2390
Wind power plant put into operation from January 1th, 2005 till December 31th, 2005 3050 2650
Wind power plant put into operation from January 1th, 2004 till December 31th, 2004 3210 2810
Wind power plant put into operation prior to January 1th, 2004 3550 3150

(1.7.1.) At the wind power plants put into operation after January 1th, 2005 inclusive the redemption prices and green bonuses according to the item (1.7.) should be applied for newly established power plants only, the technological units of which , especially the rotor and generator are in operation no longer then two years.

 

The price decision made by the Energy Regulatory Office no 2/2010 of November 3rd, 2009, which sets the supporting for the production of renewable sources energy, combined production of electric power and heat and secondary energy resources

(1.7.) Redemption prices and green bonuses for wind power plants:

Put into operation on Redemption price of the mains supplied power in CZK/MWh Green Bonus in CZK/MWh
Wind power plant put into operation from January 1th, 2010 till December 31th, 2010 2230 1830
Wind power plant put into operation from January 1th, 2009 till December 31th, 2009 2390 1990
Wind power plant put into operation from January 1th, 2008 till December 31th, 2008 2610 2210
Wind power plant put into operation from January 1th, 2007 till December 31th, 2007 2680 2280
Wind power plant put into operation from January 1th, 2006 till December 31th, 2006 2730 2330
Wind power plant put into operation from January 1th, 2005 till December 31th, 2005 2990 2590
Wind power plant put into operation from January 1th, 2004 till December 31th, 2004 3140 2740
Wind power plant put into operation prior to January 1th, 2004 3480 3080

(1.7.1.) At the wind power plants put into operation after January 1th, 2005 inclusive the redemption prices and green bonuses according to the item (1.7.) should be applied for newly established power plants only, the technological units of which , especially the rotor and generator are in operation no longer then two years.

 

The price decision made by the Energy Regulatory Office no 2/2010 of November 18th, 2008, which sets the supporting for the production of renewable sources energy, combined production of electric power and heat and secondary energy resources

(1.7.) Redemption prices and green bonuses for wind power plants:

Put into operation on Redemption price of the mains supplied power in CZK/MWh Green Bonus in CZK/MWh
Wind power plant put into operation after January 1th, 2009 2340 1630
Wind power plant put into operation from January 1th, 2008 till December 31th, 2008 2550 1840
Wind power plant put into operation from January 1th, 2007 till December 31th, 2007 2620 1910
Wind power plant put into operation from January 1th, 2006 till December 31th, 2006 2670 1960
Wind power plant put into operation from January 1th, 2005 till December 31th, 2005 2930 2220
Wind power plant put into operation from January 1th, 2004 till December 31th, 2004 3070 2360
Wind power plant put into operation prior to January 1th, 2004 3410 2700

(1.7.1.) At the wind power plants put into operation after January 1th, 2005 inclusive the redemption prices and green bonuses according to the item (1.7.) should be applied for newly established power plants only, the technological units of which , especially the rotor and generator are in operation no longer then two years.

 

The price decision made by the Energy Regulatory Office no 2/2010 of November 20th, 2007, which sets the supporting for the production of renewable sources energy, combined production of electric power and heat and secondary energy resources

(1.7.) Redemption prices and green bonuses for wind power plants:

Put into operation on Redemption price of the mains supplied power in CZK/MWh Green Bonus in CZK/MWh
Wind power plant put into operation after January 1th, 2008 2460 1870
Wind power plant put into operation from January 1th, 2007 till December 31th, 2007 2520 1930
Wind power plant put into operation from January 1th, 2006 till December 31th, 2006 2570 1980
Wind power plant put into operation from January 1th, 2005 till December 31th, 2005 2820 2230
Wind power plant put into operation from January 1th, 2004 till December 31th, 2004 2960 2370
Wind power plant put into operation prior to January 1th, 2004 3280 2690

(1.7.1.) At the wind power plants put into operation after January 1th, 2005 inclusive the redemption prices and green bonuses according to the item (1.7.) should be applied for newly established power plants only, the technological units of which , especially the rotor and generator are in operation no longer then two years.

 

The price decision made by the Energy Regulatory Office no 2/2010 of November 21th, 2006, which sets the supporting for the production of renewable sources energy, combined production of electric power and heat and secondary energy resources

(1.7.) Redemption prices and green bonuses for wind power plants:

Put into operation on Redemption price of the mains supplied power in CZK/MWh Green Bonus in CZK/MWh
Wind power plant put into operation after January 1th, 2007 2460 1950
Wind power plant put into operation from January 1th, 2006 till December 31th, 2006 2510 2000
Wind power plant put into operation from January 1th, 2005 till December 31th, 2005 2750 2240
Wind power plant put into operation from January 1th, 2004 till December 31th, 2004 2890 2380
Wind power plant put into operation prior to January 1th, 2004 3200 2690

(1.7.1.) At the wind power plants put into operation after January 1th, 2005 inclusive the redemption prices and green bonuses according to the item (1.7.) should be applied for newly established power plants only, the technological units of which , especially the rotor and generator are in operation no longer then two years.

 

The price decision made by the Energy Regulatory Office no 2/2010 of November 18th, 2005, which sets the supporting for the production of renewable sources energy, combined production of electric power and heat and secondary energy resources

(1.7.) Redemption prices and green bonuses for wind power plants:

Put into operation on Redemption price of the mains supplied power in CZK/MWh Green Bonus in CZK/MWh
Wind power plant put into operation after January 1th, 2006 2460 2020
Wind power plant put into operation from January 1th, 2005 till December 31th, 2005 2700 2260
Wind power plant put into operation from January 1th, 2004 till December 31th, 2004 2830 2390
Wind power plant put into operation prior to January 1th, 2004 3140 2700

(1.7.1.) At the wind power plants put into operation after January 1th, 2005 inclusive the redemption prices and green bonuses according to the item (1.7.) should be applied for newly established power plants only, the technological units of which , especially the rotor and generator are in operation no longer then two years.

 